New Tee Constructions and On-Course Improvements

  • #1: Build forward tee ($2,000)
  • #2: Lengthen mound on left towards green ($500)
  • #13: Relocate left bunker between green and hazard ($500)
  • #15: Build new tee to left of cart path ($2,000)
  • #17: Build forward tee ($2,000)
  • #17: Create drainage/hazard ditch left rough off tee($2,000)
  • #18: Build forward tee ($2,000)
  • Address drainage issues on problem holes (ongoing) ($5,000)
  • $16,000.00

    Funding Goal
  • $0.00

    Funds Raised
  • 1016

    Days to go
  • Target Goal

    Campaign End Method
Raised Percent :
0%
Minimum amount is $20 Maximum amount is $9500 Put a valid number
$
4436 Lakeville Rd. Geneseo, NY 14454, United States (US)

Description

  • #1: Build forward tee ($2,000)
  • #2: Lengthen mound on left towards green ($500)
  • #13: Relocate left bunker between green and hazard ($500)
  • #15: Build new tee to left of cart path ($2,000)
  • #17: Build forward tee ($2,000)
  • #17: Create drainage/hazard ditch left rough off tee($2,000)
  • #18: Build forward tee ($2,000)
  • Address drainage issues on problem holes (ongoing) ($5,000)
Sorry, no posts matched your criteria.