The entire existing parking lot needs updating, possible full replacement in some sections. Adding additional light poles create safer parking lot conditions.
Repave and Light the Main Parking Lot
-
$100,000.00
Funding Goal -
$0.00
Funds Raised -
728
Days to go -
Target Goal
Campaign End Method
Livingston Country Club Board of Directors
11 Campaigns | 0 Loved campaigns
Campaign Story
The entire existing parking lot needs updating, possible full replacement in some sections. Adding additional light poles create safer parking lot conditions.
Average price per sq. ft. for asphalt installation is $10. The parking lot is approximately 180′ x 45′ = 8,100 sq. ft. The driveway from the parking lot to 20A is approximately 75′ x 10′ = 750 sq. ft.
Total project size = 8,100sqft + 750sqft = 8,850sqft.
8,850sqft x $10 = $88,500
Lightning expenses TBD = ~$11,500