Short Story

The entire existing parking lot needs updating, possible full replacement in some sections.  Adding additional light poles create safer parking lot conditions.

Repave and Light the Main Parking Lot

by Livingston Country Club Board of Directors

  • $100,000.00

    Funding Goal
  • $0.00

    Funds Raised
  • 728

    Days to go
  • Target Goal

    Campaign End Method
Raised Percent :
0%
Minimum amount is $50 Maximum amount is $9500 Put a valid number
$
4436 Lakeville Rd. Geneseo, NY 14454, United States (US)

Campaign Story

The entire existing parking lot needs updating, possible full replacement in some sections.  Adding additional light poles create safer parking lot conditions.

Average price per sq. ft. for asphalt installation is $10.  The parking lot is approximately 180′ x 45′ = 8,100 sq. ft.  The driveway from the parking lot to 20A is approximately 75′ x 10′ = 750 sq. ft.

Total project size = 8,100sqft + 750sqft = 8,850sqft.

8,850sqft x $10 = $88,500

Lightning expenses TBD = ~$11,500